Jobsinghana.com
 

TERMS OF REFERENCE Siting, Drilling, Installation and Construction of Boreholes

JOB SUMMARY

Company GrowthAid
Industry NGO/IGO/INGO
Category W.A.S.H.
Location Ashanti Regio...
Job Status Full-time
Salary GH¢ 
Education Qualified
Experience N/A
Job Expires Mar 31, 2023
Contact ...
 

Company Profile

GrowthAid is a not-for-profit non-governmental organization limited by guarantee. Our vision is of a world where everyone has adequate access to safe water and sanitation and where no one dies from preventable diseases. GrowthAid works in collaboration with like-minded organizations to reach poor and marginalized people with safe water, improved sanitation, and hygiene services. We hold our values of accountability, integrity, transparency, and respect dearly and demonstrate these in what we do and how we work.

Job Description

TERMS OF REFERENCE
Siting, Drilling, Installation and Construction of Boreholes (including water quality testing and treatment where necessary) and Training of Area Mechanics and Pump Care Attendants in the Sekyere East District of the Ashanti Region
 
Background
GrowthAid LBG is a not-for-profit non-governmental organization which exists to provide development support and direct services to communities to improve the situation of water, sanitation, and hygiene (WASH) and contribute towards the prevention and management of neglected tropical diseases (NTDs). Our Vision is of a world where everyone has adequate safe water, sanitation, and hygiene on a sustained basis, and where no one dies from preventable diseases.
 
GrowthAid LBG, with funding from The Church of Jesus Christ of Latter-day Saints, is implementing Water, Sanitation and Hygiene for Health (WASH4Health) project in Schools, Healthcare Facilities and Communities within the Sekyere East District of the Ashanti Region. To assist with the implementation, GrowthAid LBG intends to engage the services of Contractors under GrowthAid LBG Partnership Agreement to undertake siting, drilling, construction, installation of hand and/or submersible pumps for simple and mechanized boreholes in the selected project institutions and communities. The assignment will also include the training of Area Mechanics and Pumpcare Attendants for sustainable operation and maintenance of the water system as well as carrying out analyses on pumping and water quality tests as required under GrowthAid LBG’s Water Quality Policy.
 
Objective 
The overall objective of the WASH4Health project is to provide improved hygiene practices and increase access to safe drinking water service delivery in a sustainable manner for the prevention and management of NTDs in the Sekyere East District of the Ashanti Region. 
 
Specific objectives
Specifically, the WASH4Health project, in part aims to:
i. Site, design, drill, construct, rehabilitate and install Afridev handpump for 1No. five-inch simple borehole in each of the six (6) schools in Sekyere East District
ii. Site, design, drill, construct and install Pedrollo submersible pump for 1No. five-inch mechanized borehole in each of the three (3) schools in Sekyere East District
iii. Train two (2) Area Mechanics and twelve (12) Pumpcare Attendants for sustainable operation and maintenance of the water system
 
Description of the Assignment 
The assignment requires the Contractor to site, drill, construct or rehabilitate simple and mechanized borehole for schools in the Sekyere East District in order to increase water supply service delivery, improved hygiene practices to contribute to the prevention and management of neglected tropical diseases (NTDs) within the district.
 
Scope of works
The Contractor shall, in close collaboration with GrowthAid LBG, the beneficiary institutions and communities, site, drill, construct, rehabilitate and install Afridev hand pump for up to six (6) simple boreholes in the Sekyere East District. The Contractor shall also drill, install Pedrollo submersible pump for three (3) mechanised boreholes within the same district. The Contractor shall conduct training for two (2) Area Mechanics and twelve (12) Pumpcare Attendants to ensure the water systems are operated and maintained in a sustainable manner. Details of the works are packaged in Lots and summarized in the table below.

Loop

District

Lots

Name of Institution/ Community

Simple Borehole

Mechanized Boreholes

Ashanti Region

Sekyere East

Lot 1

Buoya T.I Primary & JHS

N/A

1

Anunya D/A Primary School

1

N/A

Daakoho D/A Primary School

1

N/A

Training of Area Mechanic and Pumpcare Attendants

Total-(Lot 1)

2

1

Region

District

Lots

Name of Institution/Community

Simple Borehole

Mechanized Boreholes

Ashanti Region

Sekyere

East

 

 

 

Lot 2

Asokore T.I. Ahmadiyya Muslim Primary School

N/A

1

Okaikrom D/A Basic School

1

N/A

Nsutem Presby Primary School

1

N/A

Training of Area Mechanic and Pumpcare Attendants

Total-(Lot 2)

2

1

Region

District

Lots

Name of Institution/Community

Simple/Rehab Borehole

Mechanized Boreholes

Ashanti Region

Sekyere East

Lot 3

Ntukomso ST. Michael R/C Basic School

N/A

1

Akokoaso D/A JHS

     1

N/A

Bimma No.1 D/A Primary School

Rehab  1

N/A

Training of Area Mechanic and Pumpcare Attendants

Total-(Lot 3)

       2

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Period of Assignment 
Contractor shall commence work not later than seven (7) days after signing the Contract; and the intended completion time for the completion of works shall not to exceed forty-five (45) days from commencement date.

Expected Deliverables
i. Siting report including borehole design (the content of the report should include)

  • name and date of survey.
  • results of desk study.
  • results of hydrogeological reconnaissance.
  • the GPS coordinates and elevations, and description of locations for:

A. the priority site.

B. the second priority site

c. The back-up site.

ii. Progress report

iii. Substantial work completion records

iv. Condition report for each borehole (including GPS, depth, water quality tests, action taken to address water quality issues, final water quality tests for treated boreholes)

v. Final Report

vi. Copies of signed borehole completion record for each location.

Payment Schedule

GrowthAid LBG shall make payments upon completion of deliverable set out in the terms of reference. The Contract shall be paid on submission of invoices and appropriate report or documentation. The Contractor shall be paid in accordance with the following payment schedule:

Milestone Description

Contract Payment (%)

Mobilization

40

Completion of Substantive Construction works

40

Completion of assignment and post defect liability period

10

  Child Protection Code of Conduct
The Contractor shall sign and observe GrowthAid LBG’s Code of Conduct and Child Protection Policy strictly as stipulated in the contract.                                                                                                                           

How To Apply

Sorry, job has expired.

 
Note

Please note, employers receive numerous applications per posting and will only shortlist the most qualified candidates. Also Jobsinghana.com is not involved in any decision made by an employer/recruiter and therefore does not guarantee that applications sent will result in a candidate being shortlisted/selected for that position.
 
 
To Top